portfolio_page-template-default,single,single-portfolio_page,postid-101,ajax_fade,page_not_loaded,,qode_grid_1300,footer_responsive_adv,hide_top_bar_on_mobile_header,qode-content-sidebar-responsive,qode-theme-ver-16.9,qode-theme-bridge,qode_header_in_grid,wpb-js-composer js-comp-ver-5.5.5,vc_responsive
 

Al Mousi Cables Factory – 10th of Ramadan (2017-2018)

Al Mousi Cables Factory – 10th of Ramadan  (2017-2018)

The project consists of :


The Factory Was Built For  Manufacturing  Cables In 10th Ramadan Town With Total Area 65000 Square Meter

  • phase one of the project with area 10000 m
  • the factory was established with height 17.5 m
  • The Weight Of The Frame Is 550 Tons
  • Cost Of 12 Million For The First Stage
Date
Category
Demolition, Modeling