i groupe construction | Phosphate Factory Ain Sokhna (2016-2018):
528
portfolio_page-template-default,single,single-portfolio_page,postid-528,ajax_fade,page_not_loaded,,qode_grid_1300,footer_responsive_adv,hide_top_bar_on_mobile_header,qode-content-sidebar-responsive,qode-theme-ver-16.9,qode-theme-bridge,qode_header_in_grid,wpb-js-composer js-comp-ver-5.5.5,vc_responsive
 

Phosphate Factory Ain Sokhna (2016-2018):

The project consists of :


Phosphate Factory in Ain Sokhna: Fabrication and Erection of 2 Convertors from Hassan Allam and Intecsa.

13m Diameter, 30 m Height and 154 Ton for each unit.

Fabrication and Erection of all pipelines for Steam, Water treatment, Natural gas, Instrumentation Air and Chemicals from Hassan Allam. Fabrication and Erection of all pipelines for Steam, Water treatment, Natural gas, Instrumentation Air and Chemicals from Hassan Allam. Fabrication and erection of Ventilation and DE dusting Lines from Hassan Allam.

61 Lines from 6” to 64” from Carbon Steel and Stainless Steel 904 and 916.

104 Lines from 4” to 20” from Carbon Steel.

Fabrication and erection of 6 Tanks with the Agitators and Heating Coils from ARESCO.

 

Category
Construction, Designing, Engineering, Modeling, Planning